Drama Theatre, Nur-Sultan
05.2019 – 05.2020

PROJECT DATA

Location: Nur-Sultan, Kazakhstan
Architect: IT Engineering SA
Structural engineering: Konstat Biro, Inforsprojekt
Project type: New construction
Project time: 05.2019 – 05.2020
Construction completion: 2020

 

SERVICES PROVIDED*

STRUCTURAL ENGINEERING, DESIGN PHASES:

Design Development

Construction Documents

Construction Supervision

*Steel structures of the Roof